A series of potholes and crumbling tarmac across the side of the carriageway in the direction going towards Oxford.

Reported via desktop in the Pothole category anonymously at 16:55, Monday 2 February 2026

Sent to Oxfordshire County Council less than a minute later

These defects in the tarmac surface have been getting worse over a period of months but have deteriorated rapidly after the recent wet and freezing weather. The road from Beckley to Horton-cum-Studley including Woodperry Hill and the Straight Mile was closed for resurfacing a few years ago but proper attention was not paid to the drainage at the time. After heavy rain, runoff from the surrounding fields and woodland flows across the road surface repeatedly from one side to the other causing the tarmac to become saturated with water down to the level of the previous road surface since the new surface was laid directly onto the old tarmac. In freezing conditions, ice formation under the road surface then lifts off large sections of the new surface causing it to crumble and break up resulting in widespread potholes. This problem will only be cured by the provision of proper surface water drainage on both sides of the road down the whole length of Woodperry Hill. Patching the current holes will at best only be a temporary solution.

Council ref: ENQ261079867

Updates

  • Thank you for your enquiry. This issue has been passed onto the relevant team for investigation.

    State changed to: Investigating

    Posted by Oxfordshire County Council at 16:55, Monday 2 February 2026

  • I am a resident in Horton-cum-Studley and drive on this road every day in both directions, so have observed the condition of the surface over a long period of time.

    Posted anonymously at 17:04, Monday 2 February 2026

  • Thank you for your report. We have concluded our assessment and closed this report. The defects at this location have been identified as meeting our criteria for intervention, and repairs are scheduled to be carried out soon. We appreciate your vigilance and encourage you to report any future highway concerns.

    State changed to: Investigation complete

    Posted by Oxfordshire County Council at 13:29, Monday

This report is now closed to updates from the public. You can make a new report in the same location.