Road retarmacked after putting in cables is very uneven
Reported via desktop in the Current Roadworks - live information category anonymously at 13:00, Sunday 5 October 2025
Sent to Oxfordshire County Council less than a minute later
The roadworks being done by OCU to put in electricity cables from the Power station on the B480 (Watlington Road (OX44 6AU)) going around to the Oxford Science Park (OX44 4DQ), on the wide retarmacking parts (not the narrow ones) the road resurfacing all the way (on the parts which have been completed) are very uneven. The original road surface was flat and smooth. These retarmacked surfaces completed by "Master Mac Resurfacing Experts" (?) have not been steamrolled and therefore are very bumpy. There are still a lot or road sections to do over the next 2 years. Please would you be able to ask Master Mac Resurfacing experts (or a different retarmacking company who'll do a better job): 1. Ask them to fix/resurface/retarmac all the wide tracks of roadworks which they have already completed and to steamroll them FLAT 2. For the rest of the roadworks which they will be doing, please ask them to steamroll the sections flat properly with a steamroller which is big enough for the job (in all cases) They have done a very shoddy job on it and making a real mess of the road surface. Roadworks should leave the roads better not much worse.
Council ref: ENQ251061196
Updates
-
?
State changed to: Investigating
Posted by Oxfordshire County Council at 13:00, Sunday 5 October 2025
-
Thank you for your report. We are in communication with the network sponsor at this location to address the issue effectively.
State changed to: Investigation complete
Posted by Oxfordshire County Council at 14:29, Wednesday 15 October 2025
This report is now closed to updates from the public. You can make a new report in the same location.