You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Drain Pipe separated from gully; Ditch needs Clearing

Reported via desktop in the Blocked Drain / Gully category by Marc Thielke at 09:32, Mon 17 April 2023

Sent to Oxfordshire County Council less than a minute later

Heavy HGV traffic has caused the black plastic pipe to separate from the iron gully and was filled with dirt.

The footpath and this road gully need a ditch to drain into. Over the last ten years utility and road works have filled in the Port Way ditch at the bottom of the hedge. It is very flat here and the new Camp Road drainage is SuDS so the ditch is needed more than ever.

20 meters of clearance would match up to the Port Way ditch elevation on the East side of the road as shown in Google earth screenshot.

Council ref: ENQ23957902

Asset ID: 290052340

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your enquiry. This issue has been passed onto the relevant team for investigation.

    State changed to: Investigating

    Posted by Oxfordshire County Council at 09:33, Mon 17 April 2023

  • This report has been closed. However the issue has been passed to the relevant team for consideration for future programmed works

    State changed to: Investigation complete

    Posted by Oxfordshire County Council at 08:04, Tue 6 June 2023

This report is now closed to updates from the public. You can make a new report in the same location.