You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

Three potholes in Makins cul-de-sac 50-60

Reported via desktop in the Pothole category by Peter Hughes at 06:22, Thursday 27 January 2022

Sent to Oxfordshire County Council less than a minute later

Three large pots holes which are getting bigger. Previously reported last April 2021 this small cul-de-sac has a very high volume of traffic with cars doing three point turns twice a day, consequently the tarmac is being ripped up by the car tyres. It is used as a school drop off point for Gillotts School and I do think the area needs inspecting to repair the potholes. Long term solution make the small cul-de-sac access only to improve the longevity of the road tarmac surface.

Council ref: ENQ22915037

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your enquiry. This issue has been passed onto the relevant team for investigation.

    State changed to: Investigating

    Posted by Oxfordshire County Council at 06:23, Thursday 27 January 2022

  • Thank you for your report we have inspected the location today and have arranged for the repairs to the potholes which meet our current intervention criteria, these should be completed within the next 28days or sooner.

    State changed to: Investigation complete

    Posted by Oxfordshire County Council at 14:39, Monday 31 January 2022

This report is now closed to updates. You can make a new report in the same location.