Concrete poured onto road surface

Reported via desktop in the Roads/highways category anonymously at 09:17, Friday 19 February 2021

Sent to Oxfordshire County Council less than a minute later

Fill That Hole Report #182482 19th feb Concrete poured onto road surface at entrance to Newberry Lane. Concrete poured onto road surface instead of drop kerb installation for access to Newberry Lane. This forces cyclists to swing wide to avoid the hazard, or risk an accident by riding on an angled and unsmooth surface. 3m long, protruding into road by 10cm Maximum height 10cm 10cm from Kerb

Council ref: ENQ21887941

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your enquiry. This issue has been passed onto the relevant team for investigation.

    State changed to: Investigating

    Posted by Oxfordshire County Council at 09:18, Friday 19 February 2021

  • Thank you for your report. This is a temporary feature in situ with the permission of the road agreements team, before the permanent work can be completed. This report is now closed.

    State changed to: Investigation complete

    Posted by Oxfordshire County Council at 15:31, Thursday 4 March 2021

This report is now closed to updates. You can make a new report in the same location.