Back to all reports

Long lengthways cracks in road

Reported in the Roads/highways category by adrian tremlett at 20:12, Sun 23 September 2018

Sent to Oxfordshire County Council 3 minutes later

About 2 months ago the road was closed for repair. Though the new long patches north of the rail bridge were well done and the edges correctly sealed, the whole road has spread in width more than the asphalt can cope with despite the very hot weather. There are cracks each side of the new patches amounting to 3 cm which need to be sealed before winter. In the longer term, this 150 year old made-up causeway needs an engineering solution

RSS feed of updates to this problem Receive email when updates are left on this problem.

Provide an update

Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a FixMyStreet password?