Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Repaired pothole is continuing to grow

Reported anonymously at 10:49, Sunday 23 February 2020

I reported this pothole outside Holcot House, Market Square, in December and it was quickly repaired. In January it opened up to the south (right in the photo) and this was also repaired (thank you). But, as I could have predicted, it has now opened up to the north (left) and this is growing daily. Cars splash mud and grit directly onto our front door, and there are large pieces of stone lying around which would break a window if thrown up by a fast car. I can also foresee that it will continue to spread either side as the tarmac is badly pitted and it is obvious that the substructure is weak. I would therefore strongly recommend that the repair goes further in both directions, i.e. maybe a 4 metre stretch, otherwise this problem is going to continue. A more extensive repair would be more economical in the long run.

Topic:

optional

Don't like forms?

You can contact technical support on highway.enquiries@oxfordshire.gov.uk