Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Hundreds of meters of road markings missing

Reported anonymously at 13:10, Fri 17 May 2019

None of the road-edge markings have been re-painted after the (exceptionally poor quality) repair works have been completed to the edge of the carriageway. These are missing from the dual-carriageway to the junction with the B4030 on both sides. It is not acceptable to complete the repairs to the road structure and then simply not replace the edge markings which were ther eoriginally.

Topic:

optional