Roadworks left unfinished

Reported anonymously at 17:47, Tue 13 November 2018

Why has the re-surfacing works started last week not been completed. All of the heavy machinery was removed on Saturday yet the road surface is unfinished with the top 1 - 2 inches of tarmac having been removed. As a result there are now ramps in the road - which are starting to disintegrate, lots of loose gravel which is now a skid hazard and raised iron works which are a danger to cyclists and risk damaging vehicles.