Around 2 august contractors power cleaned the roadside drains. However they left most of the 'washings' in the gutter and now the drains are blocked again. this illustrates poor workmanship and supervision and value for OCC. It would be appreciated if the job could be done propoerly before the winter rains set in.

Reported anonymously at 11:46, Fri 21 September 2018

The first photo was taken on Aug 2 maybe a day after the contractors did the job. The second is the situation today. 21 Sept.